Demolition of the existing sheetrock hung ceiling and HVAC system
Restoration of the original ceiling moldings
Fabrication and installation of new fiberglass for molding restoration
Installation of new limestone wall panels
Installation of new decorative floor tile
Restoration of elevator cabs
Installation of new decorative limestone building entrance
Fabrication and installation of new fiberglass water table around entire storefront
Installation of new store front glass and building entryway
Demolition of 20 floors of existing hallways
Installation of new building systems; Including HVAC, fire safety and electrical systems
Installation of new hung ceilings, wall moldings and floor Tile
Demolition of 40 existing bathrooms
Installation of new plumbing and bathroom fixtures
Installation of new floor tile
Installation of new bathroom partition